News

You are here:

Reed Bed for Kalba Wildlife Center

A reed bed is under construction for the Kalba Wildlife Center.

Designed in cooperation with Blumberg- engineers as spezialized sub-consultant  for Mott Mac Donald.

Reed Bed is designed as single stage vertical flow reed bed split into 2 basins with a 3 chamber septic tank as pre-treatment.

Kalba Reed Bed excavation


Compacted reed bed basins


Installation of liner


Reinforcement work of septic tank